• B.E In EEE with 8 years Experience of Electrical projects
  • Bengaluru, Karnataka, India
  • Feb 28, 2018
Full time Engineering / Manufacturing Jobs Real Estate & Construction Jobs

Personal Summary

Project Management Skills:

  • Outstanding industry experience in power distribution system & project management experience on high voltage as well as on low voltage electrical system.
  • Hands on experience in identifying suppliers, obtaining quotations and preparing commercial invoice for clients.
  • Proven record in coordinating with partners and vendors for materials and equipment requirements with respect to utilities, machines and manpower.
  • Prowess in preparing project reports as well as reviewing project schedules and manpower planning.
  • Proven project coordination capabilities with vast experience in construction of 66KV primary substation, and 11KV and 6.6KV substation.
  • Ability to lead multidisciplinary and cross-functional team, crystallize business objectives and prioritize project objectives and scope.
  • Posse’s skills set to develop plans/schedules arrange resources and oversee all activities including technology transfer, engineering, procurement and construction.
  • Verifiable record in delivering the engineering aspects of the project as per agreed safety and quality standards.
  • Coordinating activities for the grant of statutory approvals for the project.
  • Exceptional abilities to formulate technical offers and participating in tendering.
  • Adept in adhering to Quality and HSE norms as per ISO 14001:2007, OHSAS 18001:2004 AND ISO 9001:2008 standards.
  • Electrical Supervisor Competency Certificate for 11KV from Tamilnadu Electrical Licensing Board, Chennai, Tamilnadu, India. (C License No.C46517)

Technical Prowess:

  • Dexterity in installation as well as coordination for testing and commissioning of 66KV tower lines with accessories, Power transformer,MV/LV capacitor banks,MV switchgears, Variable frequency drive, Soft starter,RTU,telecommunication panel.PABX panel,DG set,LV switchgear and small power circuit including building services.
  • Testing, Erection and Commissioning of various ranges of transformers for 11KV and 22 KV systems and their associated HT & LT switchgears.
  • Installation, Testing & Commissioning of all Distribution transformers, HV/ MV/ LT, AMF, MCC/PCC and APFC Panels.
  • Involved in HT, LT control UG cables Laying, Testing and Termination for XLPE cables, single and Double compression glanding.
  • Expertise in anchoring project activities including planning, installation, erection and commissioning activities for electrical equipment.
  • Planning and affecting maintenance schedules for machines and equipments.
  • Effective checking of the cable schedule to ensure proper route and cable size.
  • Proficiency in review and modification of drawings for base frames of all the panels and control as well as power circuit diagram.
  • Extensive exposure in handling installation and commissioning of extension panels of LT switchboards (PMCC’s & MCC’s).

Work Experience

Electrical Engineer-MEP
Jul 2017 - KEF Infrastructure India Pvt Ltd
  • Installations of all electrical works were carried out as per approved shop drawings ensuring
  • Compliance with safety requirements and as per standards.
  • Coordinate with Mechanical, civil, Architect Engineers, Discuss technical aspects of electrical system with Contractor towards successful completion of project.
  • LV switchgear substation, Installation of transformers and generators up to 1250 KVA, termination into panel boards.
  • Installation of Electrical Installation (Internal + External) - Addressable Fire Alarm system, Security(CCTV and Access control), Public Address, Internal & External Decorative light fixtures,Illumination and dimming systems, Power receptacles, Cable Routing, Earthing, cable trays for tunnel, Panel Board and Building Management System, automation System, Audio Video System,Interactive TV system & video in demand with HDMI, UPS System, Lifts, ATS panels, Computer network (Fiber Optics, cables), Telephone Network, Diesel generators, Lightning Protection System,LV & Switchgears (MDB, SMDB, MCC….).
  • Preparation of bill of quantities in Excel format for projects as per Principles of Measurements (International).
Electrical Engineer
Feb 2016 - Oct 2016 Al Rajhi Golden Company,Oman
  • Coordinating and reviewing construction and commissioning activities and obtaining approvals from local authorities and handling over completed projects to the client for end use.
  • Driving the entire construction team to achieve planned target.
  • Handling site supervision ,monitoring progress as per planning schedule and undertaking quality inspections.
  • Forecasting, project budget control, resource allocation and management of labours.
  • Monitoring schedule impacts, measuring work done through RFI& ensuring timely response to RFI’s.
  • Conducting cross verification with materials department for the usage & availability of stocks using the material tracking sheet.
  • Review and analyze of MEP drawings, materials, schedules/program of works etc.
  • Co-ordination all electro-mechanical activities with various teams at site.
  • Review the shop drawings, construction details, product data, material samples.
  • Reviewing submittals prior to submission to the client.
  • Co-ordination between MEP and civil drawings at the site.
  • Co-ordination and attending meeting with subcontractors, contractors, consultant and client.
  • Dealing with the cost consultant for variation claim towards additional works.
  • Preparing the Quantity survey for VOWD reporting, contractual issues like invoicing, variation and EOT claim.
  • Preparing As-Built drawings, O&M Manual as well as MAS for client approval.
  • Preparing the project updates and reporting to client.
  • Reporting on progress of the project on a regular basis to top management.
  • Reviewing submittals prior to submission to the client.


Project Engineer-Electrical
Apr 2013 - Dec 2015 Prajha Properties & Projects Pvt Ltd
  • Preparing and reviewing project scopes and coordinating with the engineering team for design and engineering Issues.
  • Involved in Testing & Commissioning works of all electrical works.
  • Installation, Testing and Commissioning of dry and oil type Distribution Transformers.
  • Testing & commissioning of all RMU, HV, MV, LT, AMF, APFC Panels and Motors.
  • Involved in HT, LT control UG cables/Trays laying, Testing, Termination for XLPE cables, single and Double compression glanding.
  • All internal and external electrical work of high-rise buildings as per drawings (conduiting, wiring, and testing of all electrical points).
  • Installation, Testing and Commissioning of Distribution Boards, dressing and Switch box fixing.
  • Preparation of BOQ and verifying all items in the inventory of contractor as per BOQ and      rate as per tender.
  • Verification of contractor’s bills.
  • Attend the client meetings, site visits; coordinate with the junior engineers regarding the work progress.
  • Coordinating with consultant for the engineering issues and finalizing the issues
  • Preparing the DPR for the project, coordinating with planning for the project progress and manpower control.
  • Support the procurement team for technical evaluations as per the client requirements.
  • Prepare and order the material requirements.
Site Engineer-electrical
Dec 2010 - Apr 2013 Grand Builders
  • Testing, Erection and Commissioning of various ranges of transformers for 11KV and 22 KV systems and their associated HT & LT switch gears.
  • Testing and Commissioning of distribution transformers and DG sets.
  • Installation, testing and commissioning of Power distribution Panel, HV/MV/LV switch gears, capacitor panels, AMF panels, MCC/PCC panels, VDB, LDB and PDB.
  • Laying of underground cables for HV & LV power distribution.
  • All internal and external electrical work of high rise buildings as per drawings (conduting, wiring, and testing all electrical points).
  • Inspecting of cable lay works, tray routing, cable dressing, lightning arrestor and earth pit work.
  • Sizing / Selection of power cables, control cables, breakers and fuse Unit, cable ladder / trays, cable trench, cable glands. Conduct site visit and collect information required for tie-in projects with existing facility and expansion.
  • Installation & testing of UPS System & Servo Controlled stabilizer.
  • Preparation of construction, SLD and As- built drawings.
  • Verification of contractor’s bills.
Jul 2010 - Oct 2010 Tafseer contracting Company,Abudhabi
  • Verify the electrical drawings, Conduting and wiring on the slab Power layout, Lighting layout, Gas meter layout, Central battery layout, Firefighting layout, Lightning & earthing layout, Low current layout, Telephone layout.
  • Verified all materials used for the construction and ensured that they were of Premium quality.
  • Operation and maintenance of 500KVA, 400KVA and 250KVA DG sets.
GET-Electrical Maintenance
Jun 2009 - Apr 2010 SGEL
  • Operation and Maintenance of 500KVA MV/LV/11KV /433V Distribution transformer, Air Circuit Breakers, HV/LV switchgear, DG set (500KVA) and UPS.
  • Responsible for the switching operations and maintenance of all electrical distribution system. Attending the maintenance activities on transformers, DG sets, UPS, HV/LV panels, distribution boards, lighting systems, cabling and wiring.
  • Operation and Maintenance of Electrical equipment’s like motors, pumps, Cranes, Compressors, CNC machines, HVAC and MCC/PCC panels.
  • Responsible for identifying and repairing minor electrical faults.
  • Attending maintenance activities on Transformers, DG sets, UPS, Incoming and outgoing panels, distribution boards lighting systems, cabling and wiring.
  • Supervising the functions of troubleshooting & predictive / preventive maintenance for identifying areas of obstructions and reducing machinery downtime to minimum.
  • Handling Plant Layout changing and new machineries commissioning work.
  • Monitoring and Registering the EB, D.G Readings and maintaining power factor Unity/leading level.
  •  Performed supervision on a 24/7 manufacturing unit on the work of the electricians.
  • Maintained the safety measures at the site.



B.E in Electrical and Electronics Engg
Jul 2006 - May 2009 Sethu Institute Of Technology,Anna University
Diploma In Electronics & Communication Engg
Jun 2002 - May 2005 V.S.V.N.Polytechnic College